Permit guide

Demolition permits in Brevard County: documents and steps

A demolition permit is the first thing a building office will ask about, and the documents depend on whether your address is in the county or a city. This guide lists the county’s documents, who may apply and the asbestos and septic questions that come up before the permit is issued.

Get My Free Estimate

Free estimate, no obligation. Takes about a minute.

Which permit applies

Brevard issues Residential Demolition permits for removing whole or partial structures, including single-family and two-family homes, manufactured homes, sheds, pools, carports and screen enclosures. Applications are reviewed by county staff and filed through the BASS portal. Cities with their own building departments issue permits inside their limits.

Documents the county asks for

Cities may ask for other items, so confirm with the office that covers your address.

  • The permit application.
  • A survey or dimensioned plot plan showing the buildings to be removed.
  • A Landscaping Land Clearing Affidavit.
  • Septic approval documents, if the property is on septic.
  • Subcontractor authorizations.
  • A Notice of Commencement when the job exceeds the county’s threshold.

Who can apply

The county lists demolition, building, general, residential and mobile home contractors, plus special-structure aluminum contractors, each within their license scope. Owners acting as their own contractor must appear in person under Florida’s owner-builder statute. Check any license on the state DBPR site before signing.

Notice of Commencement

Above its threshold, the county requires a Notice of Commencement to be recorded with the Clerk of Courts, uploaded to the permit and approved before inspections can be scheduled. Cities may use different thresholds, so ask the office that issues your permit.

Asbestos

Florida DEP says the federal asbestos rule exempts an isolated residential building of four or fewer units unless it was used commercially, is part of a larger project or is being cleared for a commercial structure. Other buildings need a survey and notice. Confirm with DEP and the permit office.

Septic and utilities

For properties on septic, the county asks for a Florida Department of Health approval document. Utilities must be disconnected before work. Ask the contractor to list each disconnect and any septic abandonment separately.

Inspections and closing the permit

After demolition, the office may inspect the site before the permit is closed. Ask the contractor who schedules the inspection and what the office looks for, such as removed debris, graded ground and capped utilities. Keep the closed permit and disposal records, since the next builder or a buyer may ask for them.

Questions to ask the office

Ask whether an inspection is required after demolition, whether the permit lapses if work stalls and what is needed to close it. Ask also whether a utility release is required before the permit is issued, since the utilities may need weeks to respond.

Common reasons for delay

Missing septic documents, an unrecorded Notice of Commencement, utilities not yet disconnected and applications filed with the wrong office are the usual causes of delay. Ask your contractor to walk through each before they submit.

Demolition bids

A demolition proposal for your project should itemize utility disconnects, surveys, the teardown itself, hauling and disposal, and site restoration. How demolition bids work. Ask what the bid assumes about the site: access for equipment, trees and fences, neighboring structures and utility locations. Surprises on those items are the usual source of change orders on demolition work. Ask also whether the proposal covers burying or removing the slab, protecting the sidewalk and curb, and keeping disposal tickets for your records.

How a demolition job is sequenced

  1. Walk the site and define exactly what comes down and what stays.
  2. Compare itemized proposals covering disconnects, teardown, hauling and restoration.
  3. Confirm utility shut-offs, surveys and the demolition permit before equipment arrives.
  4. Agree on neighbor protection, dust control, hours and access.
  5. Walk the cleared site, confirm grading and keep disposal records.

Check the demolition crew

Before you sign for this kind of project, confirm the contractor’s license on the DBPR site and ask for general liability and workers’ compensation proof. Ask how asbestos, utility disconnects, and debris disposal are handled, and confirm a contractor, not a junk hauler, pulls the demolition permit. The rest is on the contractor check list. Ask who arranges utility shut-offs and how debris will be sorted and disposed of. Written answers on both help avoid problems later. Ask too how the crew will handle dust and noise near neighbors, whether the proposal names the person who will be on site each day, and what insurance certificate you will receive before work begins.

Demolition questions

Do I need a permit to demolish a shed in Brevard County?

Yes, generally. The county’s Residential Demolition permit covers sheds, carports, pools and screen enclosures as well as houses. Cities have their own rules, so ask the office that covers your address before removal. Ask whether a small shed counts as an accessory structure on your parcel.

Who can pull a demolition permit?

Licensed demolition, building, general, residential or mobile home contractors within their license scope, or an owner acting as their own contractor who applies in person. Verify any license on the state DBPR site. Ask to see the permit before the equipment arrives.

Do I need a Notice of Commencement?

The county requires one above its threshold. It must be recorded with the Clerk of Courts, uploaded to the permit and approved before inspections. Cities may use different thresholds, so ask your office. Ask your contractor to confirm the threshold in writing.

What if my property is on septic?

The county permit asks for a Department of Health approval document. Ask the contractor how the tank will be handled, and ask the health department what it requires for your rebuild plan. Ask whether the tank must be located, pumped or abandoned before the permit is issued.

Demolition jobs this guide addresses

Public sources:Brevard County Residential Demolition permits (accessed Nov 2026); Florida DEP asbestos FAQ (residential exemption) (accessed Nov 2026); Florida Statutes 489.113 (contractor scope and subcontracting) (accessed Nov 2026). General information, not legal advice; confirm with the office that covers your address.

Guide reviewed November 2026.