Demolition on Merritt Island
Merritt Island is unincorporated, so demolition permits come from Brevard County. The county lists the documents it expects, and canal and river lots add flood-elevation questions for whatever is built next. This page walks through the county process and the questions waterfront owners should ask.
Who can pull the permit
The county lists demolition, building, general, residential and mobile home contractors, plus special-structure aluminum contractors, each within its license scope. Owners acting as their own contractor must apply in person. Check any license on the state DBPR site and confirm the permit will be in the contractor’s name.
Canal and river lots
On waterfront lots, removing a house can change the flood analysis for the new one. Ask the county whether a teardown is treated as new construction for floodplain purposes, and what elevation the replacement home must meet. Plan the demolition after you know the answer.
Septic and utilities
For properties on septic, the county permit asks for a Department of Health approval document. Ask the contractor to list utility disconnects and any septic abandonment as separate lines in the proposal.
Records and timing
Keep the permit, the recorded Notice of Commencement, inspection results and disposal records together. Ask the contractor to confirm who records the notice and who uploads it to the county, because inspections cannot be scheduled until it is approved.
How a demolition job is sequenced
- Walk the site and define exactly what comes down and what stays.
- Confirm utility shut-offs, surveys and the demolition permit before equipment arrives. Only the Brevard County Planning and Development (Building Permits) can confirm what your address requires.
- Walk the cleared site, confirm grading and keep disposal records.
Preparing for the first visit in Merritt Island
Ask who arranges utility shut-offs and how debris will be sorted and disposed of. Ask too how the crew will handle dust and noise near neighbors, whether the proposal names the person who will be on site each day, and what insurance certificate you will receive before work begins. Owners near the Indian River, the Banana River and residential canals sometimes find the schedule depends on tides, rain and water-table conditions, so raise it at the visit. For demolition, it is one of the first things a contractor checks. A one-line note on whether you are near central Merritt Island, south Merritt Island and canal neighborhoods off Banana River Drive saves a phone call before the contractor arrives.
Demolition permits on Merritt Island
Permits come from Brevard County Planning and Development (Building Permits). Submittals run through The county’s online BASS system. Merritt Island has no city building office, and the county staff who handle it work out of Viera, so a contractor used to island jobs will know the routine.
The county asks for the application, a survey or dimensioned plot plan showing the buildings to be removed, a Landscaping Land Clearing Affidavit, septic approval documents where the property is on septic, subcontractor authorizations and, above its threshold, a Notice of Commencement. Owner-builders file in person.
Demolition questions in Merritt Island
Who issues demolition permits on Merritt Island?
Brevard County, since the island is unincorporated, through its online BASS portal. It issues Residential Demolition permits for houses, manufactured homes, sheds, pools, carports and screen enclosures. Ask the county for its current documents list. Ask the contractor whether the permit has been submitted yet.
What does the county require for a demolition permit?
The application, a survey or dimensioned plot plan, a Landscaping Land Clearing Affidavit, septic approval documents if applicable, subcontractor authorizations and a Notice of Commencement above its threshold. Owner-builders file in person. Ask your contractor to gather each item before applying so the county can review a complete file.
Does tearing down a canal-front house change flood requirements?
It can. A replacement home may need to meet current floodplain elevation standards. Ask the county how a teardown is treated before you demolish, so the new design reflects the answer. Ask for the flood zone and elevation information on your parcel in writing.
Related demolition work around Merritt Island
- Cocoa Beach: Beachside work has other access issues.
- Melbourne: Mainland city permits come from the Melbourne Building Section.
Planning a tear-down? Start with What drives demolition cost in Brevard County.
Public sources:Brevard County Residential Demolition permits (accessed Nov 2026); FEMA substantial improvement and substantial damage guidance (accessed Nov 2026); Florida Statutes 489.113 (contractor scope and subcontracting) (accessed Nov 2026); Brevard County Building Permits (accessed Nov 2026); Wikipedia, Merritt Island (accessed Nov 2026). General information, not legal advice; confirm with the office that covers your address.
Page updated November 2026.
Demolition in Merritt Island? Start here
Tell us what is coming down and where. An independent local demolition contractor will reach out for a free site visit.